How to assemble air shower ?

Air shower room is a kind of equipment specially used for clean room decoration, it can force air through, so that dust and particles are blown away, so as to achieve the purpose of purification. Air shower installation is an important link that must be passed before the use of air shower, so the installation quality directly affects the using effect.

Preparation job before install air shower

First, the preparation before the installation of the air shower room

1. Determine the installation location: select the appropriate location according to the use requirements and the size of the air shower room. If the air shower needs to be connected to other equipment, factors such as pipes and circuits need to be taken into account.

2. Measurement size: After determining the installation position, measure the size of the air shower room, including length, width and height, to ensure that the installation can make full use of space.

3. Choose the right material: according to the measured size, choose the appropriate material, such as screws, nuts, washers, sealant, etc., to ensure the installation quality and stability.

Assembling steps

1. Install the main frame: Install the main frame in the installation position and ensure that it is secure. The main frame is mainly made of stainless steel and can withstand high winds.

2. Installation panel: The installation panel is an important part of the air shower, which can control the direction and speed of the air flow. The panels are usually made of stainless steel and can withstand high levels of wind.

3. Connect the circuit and pipeline: according to the requirements of use, connect the circuit and pipeline to ensure that the air shower room can operate normally.

4. Install power supply and control system: Install power supply and control system, including remote control, controller, etc., to ensure that users can easily control the working state of the air shower.

5. Make sealant: After the installation is completed, make sealant to ensure the tightness of the air shower room and prevent air and moisture from entering.

How to maintain the air shower ?

1. Regular cleaning: Cleaning the air shower can maintain its appearance and performance to ensure its normal operation.

2. Regular inspection: Regularly check the working status and performance of the air shower room to ensure its normal operation and timely detection of problems.

3. Avoid collision: Avoid collision in the air shower to prevent damage

Air shower installation is a complex process that requires full preparation and careful installation in order to ensure its normal work and play its maximum function. The above is about the installation of air shower room related articles, I hope to help you

How to clean the air shower ?

1. Air shower main filter The filter is located after AIRNOZZLE, and its renewal period depends on the anemometer to test the wind value (the wind value decreases) or the pressure difference (the pressure error doubles) to determine whether the modification is possible. The inspection cycle time is about 2-4 times per year.

2. The air supply position of the circulation system of the internal structure of the machine and equipment is located below the equipment, so there are relatively large pollutants deposited in the corner on the base plate, so it needs to be removed at least once a week. To determine whether the fan rotation orientation is correct. Once it is found that the centrifugal fan is rotating in reverse (the wind is seriously insufficient), please swap the free 2-phase power plug of the three-phase power supply to ensure that the reference point is rotating.

3. Front filter: The front filter is under the machine. Please remove the circulation air outlet and drag out the front filter. The blockage of the front filter varies according to the number of uses and cleaning conditions. Please check the blockage time before use, and then clean it by compressed gas, water cleaning, vacuum pump dust removal, etc. According to the general application situation every month 2-3 second cleaning must be able to do.

Leave a Reply

Your email address will not be published. Required fields are marked *

Table of Contents

More Products

Single Person Air Shower

Outter Size: 1400*1000*2100 mm
Inner Size : 800*910*1980 mm
Voltage:   110/220/380 V  50/60 Hz
Nozzle:    12pcs  Left 6 ps  Right 6 psc
Material:  SS201 / SS304 / SS316 / Power Coated Plate
Function : Inteligent Englih Voice  Electricl interlock

                 H13 / H 14 HEPA class 100 

Air Shower Price:        1350-1750 USD

Fast Shutter Door Air Shower

Outter Size: 2400*2000*2500 mm
Inner Size : 1800*2000*2000 mm
Voltage:   110/220/380 V  50/60 Hz
Nozzle:    12pcs  Left 6 ps  Right 6 psc
Material:  SS201 / SS304 / SS316 / Power Coated Plate
Function : Inteligent Englih Voice  Electricl interlock

                 H13 / H 14 HEPA class 100 

Air Shower Price:        5500-7500 USD

Dynamic Pass Box

Dynamic Pass Box

Materials :  SS201/304/316  Powder coated plate

Volate : 110-240v

Interlock: Electric  interlocck

UV light : Yes

Size: Customized

EXW Price :  800-1500 USD

Get In Touch

Get in touch with our professional team today, and we will respond to you within 48 hours.

Zhang Jie

MANAGER

Adm Cheise

manager

Kevin Zhang

manager

Cici

manager

Lili Zhu

after sale

Can Wang

CTO

Please enable JavaScript in your browser to complete this form.
Please input your name
Please input your email
Please input your phone number with country code
Please input your Messages

Request A Quote

Get in touch with our professional team today, and we will respond to you within 48 hours.

Can Wang

CTO

Adam Cheise

Founder

Cici

Manager

Kevin Zhang

Manager

Amanda Lee

MANAGER

Wen Zhu

AFTER SALE

Please enable JavaScript in your browser to complete this form.
Please input your name
Please input your email
Please input your phone number with country code
Please input your Messages